Grid stability at the distribution edge

Correct frequency deviations before they propagate and maintain voltage at the end-of-line customers where stability is hardest to hold.

Millisecond frequency response

Modular and distributed

10C Discharge

Maintain stability as generators retire

Torus fills the gap left by retiring generation fleets with distributed assets that provide frequency response and voltage support that grow with every new deployment.

How it works

1

Grid operators configure how frequency and voltage services are dispatched

Torus integrates with existing EMS and SCADA systems for direct dispatch control, or Torus Arc manages response automatically based on local grid measurements. 

2

When frequency deviates, Torus responds in milliseconds.

Torus responds to unplanned events, ramping to full discharge in less than 160 milliseconds after receiving utility dispatch signal.

Flywheel delivers fast frequency response

Torus Spin has a 10C discharge rate, which is 20x that of a typical 0.5C battery system, adding stabilizing energy right when a frequency event hits. 

3

Voltage support maintains power quality at end-of-line feeders

Distribution-edge customers see voltage problems first. Torus absorbs or injects reactive power at the point of connection, where centralized resources struggle to reach.

4

Every new deployment extends stability coverage across the grid

Each installation adds another point of frequency and voltage support. As the fleet grows, targeted response becomes system-wide resilience.

Consolidate key grid services into one platform…

Optimize your grid with Torus
Explore how flexible capacity clears the constraints on your system.

Your questions, answered.